The substructure does most of the work.
On a hillside the boards are the easy part. What carries them, and how it is tied back into the slope, is what you are really paying for.
We frame for the exposure and the span, then finish with timber or composite and a rail that keeps the view rather than fencing it off.
- Framing and footings sized for the span
- Boards specified for sun and weather exposure
- Cable rail kept low so the view survives
What we take on.
Full deck construction
Footings, framing, decking and rail as one job, engineered where the slope calls for it.
Timber and composite decking
Chosen for how much sun the deck takes and how much maintenance you actually want.
Railings and cable rail
Code-compliant and detailed so it reads as thin as possible against the view.
Steps and level changes
Consistent risers and proper landings, tied into the deck rather than bolted on.
Covered decks
Roofs and pergolas on posts sized for the span and the wind.
Repairs and replacement
Rot, movement and failed fixings assessed honestly, because sometimes the frame is fine and sometimes it is not.
The things people ask us first.
Thinking about decks?
We will walk the site, tell you straight what it will take, and put a real number on it. The visit and the estimate are free.
