Flooring

What it takes

Flat floors, and transitions you do not trip on.

Older Los Angeles houses rarely have two rooms at the same level. Most bad flooring jobs are really bad levelling jobs.

We prepare the subfloor first, then lay timber, tile or vinyl with transitions that sit flush between rooms.

  • Subfloor levelled before anything is laid
  • Movement gaps and transitions detailed properly
  • Material matched to the room and the traffic
Get a Quote
Bedroom with stone fireplace, mounted television and wide window onto garden
Scope

What we take on.

Hardwood installation

Engineered or solid, acclimatised before laying and set out to run with the light.

Vinyl and laminate

The practical option for wet or high-traffic rooms, laid on a properly prepared base.

Tile floors

Levelled, set out from the visible edge, with movement joints where they belong.

Floor repair and refinishing

Sanding, staining and patching timber that is worth saving.

Subfloor preparation

Levelling, moisture checks and repair, which is where most of the quality lives.

Room-to-room transitions

Thresholds that sit flush rather than becoming the thing everyone catches.

Common Questions

The things people ask us first.

Can you match my existing floor?
Often, for repairs and extensions. Bring us a board or let us see it on the walkthrough.
Refinish or replace?
If there is thickness left in the timber, refinishing is cheaper and looks as good. We will measure and tell you.
How long before I can walk on it?
Depends on the material and finish. We will give you the real number, including cure times, in the schedule.
Next step

Thinking about flooring?

We will walk the site, tell you straight what it will take, and put a real number on it. The visit and the estimate are free.